A graph of this nature really doesn't work. Going up by this amount on the densitys just doesn't create a nice line with this data. It's basically a horizontal line.
Can I do this for my density (which is the y-axis).
Start at 0.00 then shoot up to .98 then go to 1.00, then 1.02, then 1.04, etc. etc. is this allowed or is this not allowed when graphing?