I have a single Feed at X lbm/hr of 46% B and 54%T which exits through feeds, R1 and R2. with R1 being 98% B and R2 being 95% T (all in moles percents). I need to compute the flow rates of R1 and R2.
I am pretty sure that the flow rates should add up to Feed X's flow rate, so R1 + R2 = X, but I do not know how to go from there. An explanation or some hints would be greatly appreciated.
----
This is what I did.
I assumed 100 lbm/hr to make it simple, so 46 lbm/hr B and 54 lbm/hr T.
R1 is .98*46lbm/hr = 45.08 B and .02*54=1.08 T ==> 46.16
R2 is .95*54lbm/hr = 51.30 T and .05*46=2.3 B ==> 53.6
Total is 99.76, so it seems something I did is wrong.
( by lbm I mean lbmol )